skip to main content Access Keys List

Access Keys Definition

Remember to use the 'Alt' key in combinatuion with the access key in Windows and the 'Ctrl' key in combination with the access key in Mac

Windows requires that the 'Enter' key be pressed after the access key is activated.

Select a bookmarking site.

Or copy the link below

http://www.nasa.gov/centers/
kennedy/home/index.html

Inside Kennedy

Public Inquiries

John F. Kennedy Space Center Kennedy Space Center, FL 32899
Phone: 321.867.5000
Email: Public Inquiries

Connect to Kennedy

Media Gallery Featured Categories

Media Gallery Results - 1 - 20 of 173 returned

Category: Photo of the Month To refine search, enter text here + GO

Open Image KSC-2009-4893
KSC-2009-4893 (08/28/2009) --- CAPE CANAVERAL, Fla. – Viewed from the Banana River Viewing Site at NASA's Kennedy Space Center in Florida, space shuttle Discovery arcs through a cloud-brushed sky lighted by the trail of fire after launch on the STS-128 mission. Liftoff from Launch Pad 39A was on time at 11:59 p.m. EDT. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions. The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system. Read more...

S | M | L | Details
Open Image KSC-2009-4840
KSC-2009-4840 (08/25/2009) --- CAPE CANAVERAL, Fla. – Lightning over NASA Kennedy Space Center's Launch Pad 39A competes with the xenon lights on the pad illuminating space shuttle Discovery waiting for a scheduled liftoff on the STS-128 mission. Launch was scrubbed due to the weather conditions that violated the limitations for liftoff. Another launch attempt was scheduled for 1:10 a.m. Aug. 26. Discovery's 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. Read more...

S | M | L | Details
Open Image KSC-2009-4408
KSC-2009-4408 (08/04/2009) --- CAPE CANAVERAL, Fla. – Space shuttle Discovery is silhouetted against the dawn sky as it rolls out to Launch Pad 39A at NASA's Kennedy Space Center in Florida. The 3.4-mile journey was slower than usual as technicians stopped several times to clear mud from the crawler's treads and bearings. The waterlogged crawlerway can be seen in the foreground. First motion out of the Vehicle Assembly Building was at 2:07 a.m. EDT Aug. 4. Rollout was delayed approximately 2 hours due to lightning in the area. Read more...

S | M | L | Details
Open Image KSC-2009-4407
KSC-2009-4407 (08/04/2009) --- CAPE CANAVERAL, Fla. – Space shuttle Discovery is silhouetted against the dawn sky as it rolls out to Launch Pad 39A at NASA's Kennedy Space Center in Florida. First motion out of the Vehicle Assembly Building was at 2:07 a.m. EDT Aug. 4. Rollout was delayed approximately 2 hours due to lightning in the area. The 3.4-mile journey was slower than usual as technicians stopped several times to clear mud from the crawler's treads and bearings caused by the waterlogged crawlerway. Discovery's 13-day flight will deliver a new crew member and 33,000 pounds of equipment to the International Space Station. Read more...

S | M | L | Details
Open Image KSC-2009-4406
KSC-2009-4406 (08/04/2009) --- CAPE CANAVERAL, Fla. – Space shuttle Discovery is silhouetted against the dawn sky as it rolls out to Launch Pad 39A at NASA's Kennedy Space Center in Florida. First motion out of the Vehicle Assembly Building was at 2:07 a.m. EDT Aug. 4. Rollout was delayed approximately 2 hours due to lightning in the area. The 3.4-mile journey was slower than usual as technicians stopped several times to clear mud from the crawler's treads and bearings caused by the waterlogged crawlerway. Discovery's 13-day flight will deliver a new crew member and 33,000 pounds of equipment to the International Space Station. Read more...

S | M | L | Details
Open Image KSC-2009-4404
KSC-2009-4404 (08/03/2009) --- CAPE CANAVERAL, Fla. – Lightning makes a dramatic background and slows the rollout of space shuttle Discovery to Launch Pad 39A at NASA's Kennedy Space Center in Florida. First motion of the shuttle out of the Vehicle Assembly Building was at 2:07 a.m. Aug. 4. Discovery's 13-day flight will deliver a new crew member and 33,000 pounds of equipment to the International Space Station. The equipment includes science and storage racks, a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill. Launch of Discovery on its STS-128 mission is targeted for late August. Photo courtesy of Justin Dernier, EPA

S | M | L | Details
Open Image KSC-2009-4403
KSC-2009-4403 (08/03/2009) --- CAPE CANAVERAL, Fla. – Rollout of space shuttle Discovery is slow-going due to the onset of lightning in the area of Launch Pad 39A at NASA's Kennedy Space Center in Florida. First motion of the shuttle out of the Vehicle Assembly Building was at 2:07 a.m. Aug. 4. Discovery's 13-day flight will deliver a new crew member and 33,000 pounds of equipment to the International Space Station. The equipment includes science and storage racks, a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill. Launch of Discovery on its STS-128 mission is targeted for late August. Photo courtesy of Justin Dernier, EPA

S | M | L | Details
Open Image KSC-2009-4115
KSC-2009-4115 (07/15/2009) --- CAPE CANAVERAL, Fla. – The nearby water captures the brilliant light from space shuttle Endeavour's liftoff from NASA Kennedy Space Center's Launch Pad 39A on the STS-127 mission. Liftoff was on-time at 6:03 p.m. EDT. Today was the sixth launch attempt for the STS-127 mission. The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate. The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Read more...

S | M | L | Details
Open Image KSC-2009-3871
KSC-2009-3871 (06/27/2009) --- CAPE CANAVERAL, Fla. – The light from engine ignition is reflected in the water near Launch Complex 37 at Cape Canaveral Air Force Station in Florida as a Delta IV rocket clears the tower with the GOES-O satellite aboard. Liftoff was at 6:51 p.m. EDT. The first attempt to launch GOES-O, on June 26, was scrubbed due to thunderstorms in the vicinity of Cape Canaveral. The latest Geostationary Operational Environmental Satellite, GOES-O was developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA. Read more...

S | M | L | Details
Open Image KSC-2009-3395
KSC-2009-3395 (06/02/2009) --- CAPE CANAVERAL, Fla. – Space shuttle Atlantis on top of the Shuttle Carrier Aircraft, or SCA, is parked on the tarmac of NASA Kennedy Space Center's Shuttle Landing Facility. The SCA landed at Kennedy after a more than 2,500-mile cross-country ferry flight from NASA's Dryden Flight Research Center at Edwards Air Force Base in Southern California. The SCA is a modified Boeing 747 jetliner. Atlantis returned from California atop the SCA after its May 24 landing at Edwards Air Force Base, concluding mission STS-125. The ferry flight from Edwards began June 1. Atlantis' next assignment is the STS-129 mission, targeted to launch in November 2009. Photo credit: NASA/Kim Shiflett

S | M | L | Details
Open Image KSC-2009-3176
KSC-2009-3176 (05/15/2009) --- CAPE CANAVERAL, Fla. – Near Launch Complex-41 on Cape Canaveral Air Force Station in Florida, a scrub jay keeps watch of activity. On the pad, the Atlas V/Centaur is undergoing a wet dress rehearsal, or countdown test. The Atlas V is being fully loaded with propellants including liquid hydrogen, liquid oxygen and RP-1 fuel. Following the rehearsal, the launch vehicle will be rolled off the pad and returned to the Vertical Integration Facility on May 16. The Atlas V/Centaur is the launch vehicle for NASA's Lunar Reconnaissance Orbiter, or LRO, and NASA's Lunar CRater Observation and Sensing Satellite, known as LCROSS. Read more...

S | M | L | Details
Open Image KSC-2009-2779
KSC-2009-2779 (04/18/2009) --- CAPE CANAVERAL, Fla. –– At NASA's Kennedy Space Center in Florida, the payload canister with the Hubble Space Telescope equipment travels in the dark as it heads for Launch Pad 39A, at left. On the pad, the Hubble equipment will be transferred to space shuttle Atlantis' payload bay. Atlantis' 11-day STS-125 mission to service Hubble is targeted for launch May 12. The flight will include five spacewalks in which astronauts will refurbish and upgrade the telescope with state-of-the-art science instruments. As a result, Hubble's capabilities will be expanded and its operational lifespan extended through at least 2014. Photo credit: NASA/Kim Shiflett

S | M | L | Details
Open Image KSC-2009-2761
KSC-2009-2761 (04/18/2009) --- CAPE CANAVERAL, Fla. –– Early morning light falls on space shuttle Endeavour on Launch Pad 39B at NASA's Kennedy Space Center in Florida. It joins space shuttle Atlantis on Launch Pad 39A. This is probably the final time two shuttles will be on launch pads at the same time with the space shuttle fleet set for retirement in 2010. Endeavour will be prepared on the pad for liftoff in the unlikely event that a rescue mission is necessary following space shuttle Atlantis' launch on the STS-125 mission to service NASA's Hubble Space Telescope. Read more...

S | M | L | Details
Open Image KSC-2009-2757
KSC-2009-2757 (04/18/2009) --- CAPE CANAVERAL, Fla. –– As dawn begins to brighten the sky over Launch Pad 39B at NASA's Kennedy Space Center in Florida, space shuttle Endeavour is seen bathed in lights from the fixed service structure. Endeavour joins Atlantis, which is on Launch Pad 39A. With the space shuttle fleet set for retirement in 2010, this is expected to be the final time two shuttles will be on launch pads at the same time. Endeavour will be prepared on the pad for liftoff in the unlikely event that a rescue mission is necessary following space shuttle Atlantis' launch on the STS-125 mission to service NASA's Hubble Space Telescope. Read more...

S | M | L | Details
Open Image KSC-2009-2756
KSC-2009-2756 (04/18/2009) --- CAPE CANAVERAL, Fla. –– Space shuttle Atlantis on Launch Pad 39A is viewed across the lagoon at NASA's Kennedy Space Center in Florida. Atlantis is targeted to launch May 12 on the STS-125 mission to upgrade NASA's Hubble Space Telescope. Photo credit: NASA/Jack Pfaller

S | M | L | Details
Open Image KSC-2009-2755
KSC-2009-2755 (04/18/2009) --- CAPE CANAVERAL, Fla. –– Seen on Launch Pads 39A and 39B at NASA's Kennedy Space Center in Florida are shuttles on both pads. At left is space shuttle Atlantis, poised for the STS-125 mission targeted to launch May 12, and at right is space shuttle Endeavour. Endeavour will be prepared on the pad for liftoff in the unlikely event that a rescue mission is necessary following space shuttle Atlantis' launch May 12 on the STS-125 mission to upgrade NASA's Hubble Space Telescope. After Atlantis is cleared to land, Endeavour will move to Launch Pad 39A for its upcoming STS-127 mission to the International Space Station, targeted to launch June 13. Photo credit: NASA/Jack Pfaller

S | M | L | Details
Open Image KSC-2009-2754
KSC-2009-2754 (04/18/2009) --- CAPE CANAVERAL, Fla. –– Space shuttle Atlantis on Launch Pad 39A is viewed across the lagoon at NASA's Kennedy Space Center in Florida. Atlantis is targeted to launch May 12 on the STS-125 mission to upgrade NASA's Hubble Space Telescope. Endeavour will be prepared on the pad for liftoff in the unlikely event that a rescue mission is necessary following space shuttle Atlantis' launch May 12 on the STS-125 mission to upgrade NASA's Hubble Space Telescope. After Atlantis is cleared to land, Endeavour will move to Launch Pad 39A for its upcoming STS-127 mission to the International Space Station, targeted to launch June 13. Photo credit: NASA/Jack Pfaller

S | M | L | Details
Open Image KSC-2009-2750
KSC-2009-2750 (04/18/2009) --- CAPE CANAVERAL, Fla. –– Space shuttle Endeavour is silhouetted against the dawn pink sky on Launch Pad 39B at NASA's Kennedy Space Center in Florida. Surrounding the pad are the lightning towers erected for NASA's Constellation Program, which will use the pad for Ares rocket launches. Dotting the dark blue sky at upper right is the moon. Endeavour will be prepared on the pad for liftoff in the unlikely event that a rescue mission is necessary following space shuttle Atlantis' launch May 12 on the STS-125 mission to upgrade NASA's Hubble Space Telescope. Read more...

S | M | L | Details
Open Image KSC-2009-2749
KSC-2009-2749 (04/18/2009) --- CAPE CANAVERAL, Fla. –– Space shuttle Endeavour is silhouetted against the dawn pink sky on Launch Pad 39B at NASA's Kennedy Space Center in Florida. Surrounding the pad are the lightning towers erected for NASA's Constellation Program, which will use the pad for Ares rocket launches. Dotting the still dark sky at upper right is the moon. Endeavour will be prepared on the pad for liftoff in the unlikely event that a rescue mission is necessary following space shuttle Atlantis' launch May 12 on the STS-125 mission to upgrade NASA's Hubble Space Telescope. Read more...

S | M | L | Details
Open Image KSC-2009-2724
KSC-2009-2724 (04/17/2009) --- CAPE CANAVERAL, Fla. – Just before dawn, space shuttle Endeavour is bathed in xenon lights after being secured on Launch Pad 39B at NASA's Kennedy Space Center in Florida. First motion on rollout from the Vehicle Assembly Building was at 11:57 p.m. EDT April 16. Surrounding the pad are the new lightning towers erected for NASA's Constellation Program, which will use the pad for Ares rocket launches. Endeavour will be prepared on the pad for liftoff in the unlikely event that a rescue mission is necessary following space shuttle Atlantis' launch on the STS-125 mission to service NASA's Hubble Space Telescope. Read more...

S | M | L | Details